Taking a Pass on Gas – Wood Preferred - Part Three
By
High Desert Homesteading
This is the final installment of this wood stove installation article. Actually, a major remodeling project more accurately describes the entire process.
Part 1 and Part 2 covered the near total demolition of the original gas fireplace, which was encased in a large moss rock structure, and the installation of hearth flagstone and a cultured stone (partial) back wall. Part two ended with several large tasks still to complete.
Those chores involved a lot of woodwork on the back wall and ceiling, the installation of a new insulated chimney stack, moving the 450lb wood stove up some stairs and onto the hearth, and the final installation work to prepare for the first wood fire. Continue reading Taking a Pass on Gas – Wood Preferred – Part Three